FEDERAL REPUBLIC OF NIGERIA  ·  ENERGY COMMISSION OF NIGERIA (ECN)  ·  ESTABLISHED UNDER ECN ACT, CAP. E10, LFN 2004
An official service of the Energy Commission of Nigeria.
Data Bank/Electricity Statistics/Electricity Sent Out
electricitymonthlytransmission

Electricity Sent Out

0 records  ·  GWh ·  NEDB ID: electricity_sent_out

Electricity Sent Out — Time Series
0 records · GWh
Data source: ECN  ·  Committed to NEDB via Staff Upload Portal  ·  Unit: GWh
Statistical Analysis
What Is This?

Electricity dispatched from generating plants to the national transmission network each month — gross generation minus the plant's own internal energy use (auxiliary consumption). Measured in GWh.

How to Read

Sent-out is what the grid actually receives. The difference between generation and sent-out is station own-use, typically 3–8% of gross generation. A widening gap suggests plant inefficiency.

Why It Matters

Sent-out energy is the true supply baseline for Nigeria's grid. It directly determines how much power the Transmission Company of Nigeria (TCN) can wheel to distribution companies.

Full Data Table — Electricity Sent Out0 records
Showing 0 of 0 recordsUnit: GWh
#PeriodRegionValueUnitData SourceNotes
No records. Upload a dataset to populate this series.
About this Series

Total electricity delivered from generating plants to the transmission network (gross generation minus auxiliary consumption), reported monthly.

Source agency: TCN / NERC
Methodology Note

Sent-out energy is metered at the high-voltage busbar at each generating plant. The difference between generation and sent-out is auxiliary/station service consumption. TCN aggregates metered data from all grid-connected plants monthly.

Apex AI