
Electricity Sent Out
0 records · GWh · NEDB ID: electricity_sent_out
Electricity dispatched from generating plants to the national transmission network each month — gross generation minus the plant's own internal energy use (auxiliary consumption). Measured in GWh.
Sent-out is what the grid actually receives. The difference between generation and sent-out is station own-use, typically 3–8% of gross generation. A widening gap suggests plant inefficiency.
Sent-out energy is the true supply baseline for Nigeria's grid. It directly determines how much power the Transmission Company of Nigeria (TCN) can wheel to distribution companies.
| # | Period | Region | Value | Unit | Data Source | Notes |
|---|---|---|---|---|---|---|
| No records. Upload a dataset to populate this series. | ||||||
Total electricity delivered from generating plants to the transmission network (gross generation minus auxiliary consumption), reported monthly.
Sent-out energy is metered at the high-voltage busbar at each generating plant. The difference between generation and sent-out is auxiliary/station service consumption. TCN aggregates metered data from all grid-connected plants monthly.